Tarmac overcome challenges at a housing development

Tarmac overcome challenges at a housing development

Ground Developments found themselves digging 3.5m3 below ground level to overcome the poor ground conditions on this site.

Previously, they had stabilised the ground using the stabilisation arm of their company but due to the site being extremely tight, when doing the stabilisation works, they could not carry out any other works on site due to the limited access. This mass foundation was being poured at 800mm depth, which meant that no-one could enter the trench to move the concrete.

To meet the challenge Tarmac proposed the use of TOPFLOW TRENCHFLOW which would move and flow around the foundation walls, minimising the need for any site staff to be in contact with the concrete, which would have obvious health & safety benefits. The TOPFLOW TRENCHFLOW could be discharged directly from the truck, finding its way around the foundation whilst requiring no vibration.

The end result was surprising to the customer as the TOPFLOW TRENCHFLOW flowed around the entirety of the foundation footprint from only two discharge points. With the trucks being completely discharged within two minutes each, this also eased the site’s vehicle management plan. It also meant that the 28m3 pour was finished extremely quickly without the need to use their 40T excavator.

Add to Project Board

Create a new project board:


View Free-flowing, self-compacting concrete - Topflow Product Entry
Tarmac Concrete and Screed

Tarmac Concrete and Screed

Tarmac's Readymix business is the UK’s leading supplier of innovative concrete solutions. Their range of specialist concretes includes 1000’s of different formulations, ranging from self-compacting and early strength mixes, to underwater and heat...
View company profile
You may also be interested in this related Case Study: Fibre reinforced concrete for deep water container terminal Read Now