Wallbarn have provided their M-Tray® green roof as part of a refurbishment of an existing building next to the Regent Canal in London.
A pully hoist was the only method of access available so 500 x 500 x 100mm of M-Tray® was lifted one at a time, completing the project in 2 days.
View M-Trays® Modular Green Roof System Product Entry